GLOBAL VILLAGE- DUBAI

Owner: GLOBAL VILLAGE

Main Contractor: CHINA NATIONAL AEROTECHNOLOGY      INTERNATIONAL ENGINEERING COOPERATION  

Year:  2019/2020

Scope of Work: As Built survey for elevations of six existing pavilions and three existing entrances to city mall in global village using Trimble S5 Total Station with 1” accuracy and Digital Level machine

BEE’AH NEW HEADQUARTERS SHARJAH

Owner BEE’AH

Main Contractor: AF CONSTRCUTION

Year:  2019/2020

Scope of Work: Scanning for the new historical building for Bee’ah Project in Sharjah using high accuracy scanner Faro for proper surveying.

DIBBA BULK HANDLING PROJECT

Owner: FUJAIRAH PORT

Consultant: JACOBS

Contractor: TYPSA

Year:  2019/2020

Scope of Work: Topographical survey of selected area using GPS GNSS, Aero photogrammetry with Leica Aibot AX20 and ZEISS Ventum 2.8/21mm Lens

AL DHAFRA SOLAR PROJECT- HYDROLOGY STUDY AND HIDRAULIC MODELING

Owner: Emirates Water and Electricity Company (EWEC)

Developer: EDF RENOUVELABLES AND JINKO POWER

EPC: CHINA MACHINERY and ENGINEERING COPORATION

Year:  2020/2021

Scope of Work: Hydrology Study and hydraulic modeling of rainwater runoff simulation in 1D steady flow, 2D unsteady flow calculations, sediment transport/mobile bed computations, and water temperature/water quality modeling

DEVELOPMENT OF FIRE FIGHTING NETWORK JEBEL ALI

Owner: DP WORLD

Consultant: AECOM

Year:  2020/2021

Scope of Work: Three different optimal options were carried out in JAFZA NORTH Area, adapting the type of survey to the type of orography present throughout the area of study, using the combination of three methodology: Traditional GPS Survey with Trimble R8s, and new data acquisition with Mobile Mapping Trimble MX2 and UAV- Drone Survey with Leica Aibot AX 20.