Electra completed 1600 km of double carriageway precise leveling works for Dubai Municipality as part of a First Row, Second Class. The project was executed using Leica LS15 digital levels, ensuring high-accuracy elevation control across the full alignment.
Project -
Client -
Year -
Scope -
Dubai Blue Metro Line Precise & GNSS Leveling
Mapa Li Mak CRRC Consortium
2025/2025
Executed 40 km of precise leveling works for MAPA–Li Mak JV on the Dubai Metro Blue Line project. Ensured strict elevation accuracy. Reinforced Electra’s position as a trusted surveying partner for international contractors
Project -
Client -
Year
-
Scope -
DEWA PH-3 & 6 - MBR SOLAR PARK
2025/2025
2025/2026
Primary control network establishment and comprehensive topographic survey works for L&T. This reflects Electra’s technical strength in delivering large-scale infrastructure survey packages in line with contractual requirements
Project -
Client -
Year -
Scope -
Al Daon Road Development of Roundabouts
WBG (Western Bainoona Group)
2025/2025
Conducted detailed topographic survey for Al Daon Road Roundabout Development project using GPS technology and Trimble MX50. Delivered accurate 3D mapping and surface data to support design and construction activities.
Project -
Client -
Year -
Scope -
MAFRAQ INDUSTRAIL CITY
Al Geemi Contracting Co. L.L.C
2025/2025
Conducted detailed topographic survey works for Mafraq Industrial City using GNSS GPS systems and the Trimble MX50 Mobile Mapping System. Delivered high-accuracy terrain and infrastructure data to support planning and development activities
Project -
Client -
Year -
Scope -
JAFZA Logistics Park
DP World
2025/2025
Executed comprehensive topographic survey works for JAFZA Logistics Park utilizing GPS technology and Trimble MX50 MMS. Captured high-density geospatial data to facilitate design coordination and construction planning.